HomeFeaturesBill of Materials
Linked to Purchase & Sales

Build your product,
know your cost

Define every component that goes into your product. VittaLogic calculates the total cost automatically — and lets you explode the BOM into a Purchase or Sales Order in one single click.

BoM — Solar Grid 5KW
Head BoM · 2-level structure · Linked to Purchase & Sales
Total Cost / Unit
₹2,18,500
BoM Tree
Cost Breakdown
Qty Scaling
Component
Qty
UoM
Cost
Solar Grid System 5KW HEAD BoM
1
Set
₹2,18,500
Solar Panel Assembly Sub BoM
1
Set
₹1,02,000
Solar Panel 500W Material
10
Pcs
₹85,000
MC4 Connector
20
Pcs
₹4,000
Mounting Structure
1
Set
₹13,000
Power Electronics Sub BoM
1
Set
₹1,16,500
Inverter 5KW
1
Pcs
₹55,000
Battery 150Ah × 4
4
Pcs
₹48,000
One click — BoM exploded to Purchase Order
All components, quantities & costs transferred automatically
2-Level
BoM Structure
Auto
Cost Calc
1-Click
Explode to Order
Scale
Qty Based Cost
BoM Structure

Two levels — Head BoM and Sub BoM

VittaLogic uses a clean, simple 2-level structure that covers most manufacturing and assembly businesses without unnecessary complexity.

  • 📋
    Head BoM
    The finished product — e.g. "Solar Grid System 5KW". Contains Sub BoMs or direct materials. The total cost of all components rolls up here automatically.
  • 📦
    Sub BoM
    A sub-assembly group inside the Head BoM — e.g. "Solar Panel Assembly" or "Power Electronics". Each Sub BoM holds its own direct materials.
  • 🔩
    Direct Materials
    Individual components — Solar Panel, Inverter, Battery, Cables, Connectors. Each carries its unit cost, quantity, and UoM. Can sit inside a Sub BoM or directly under the Head BoM.
🏭
HEAD BoM — Solar Grid System 5KW
Finished product · Total cost: ₹2,18,500
☀️
Sub BoM
Solar Panel Assembly · ₹1,02,000
Solar Panel 500W × 10
MC4 Connector × 20
Mounting Structure × 1
Sub BoM
Power Electronics · ₹1,16,500
Inverter 5KW × 1
Battery 150Ah × 4
DC Cable × 30m
Head BoM
Sub BoM
Direct Material
Real World Example

Solar Power Grid — BoM for every capacity

VittaLogic ships with the structure to build BoMs for Solar Grid Systems across all capacities. Each system has its own component list and auto-calculated cost.

1 KW System
3 KW System
5 KW System
10 KW System
Cost comparison across Solar Grid capacities
1 KW
₹53,000
3 KW
₹1,28,500
5 KW
₹2,18,500
10 KW
₹3,94,000
Killer Feature

Explode the BoM —
create an order in one go

The biggest time-saver in VittaLogic's BoM module. Instead of manually adding every component to a purchase order, just explode the BoM. All materials, quantities, and costs flow directly into a Purchase Order or Sales Order — instantly. One product, one click, full order ready.

📋

Select Head BoM & Quantity

Choose the product BoM and enter how many units you want to produce or sell — e.g. 3 units of Solar Grid 5KW.

Click "Explode BoM"

VittaLogic multiplies all component quantities by the number of units — 10 panels becomes 30, 4 batteries becomes 12. Automatically.

🛒

Convert to Purchase Order

All components populate a Purchase Order — item, qty, rate, GST. Select your vendor and raise the PO. Done.

🧾

Or Convert to Sales Order

If selling assembled products — explode BoM into a Sales Order with finished goods. Pricing and GST auto-applied from your rate card.

All Live Features

Everything live in BoM today

These features are fully available in VittaLogic right now — used by manufacturing and assembly businesses every day.

🏗️

Head BoM with Sub BoMs or Direct Materials

Create a Head BoM for your finished product. Inside it, add Sub BoMs for sub-assemblies or add materials directly. Full 2-level tree structure — clean, visual, and easy to manage.

Live Now
💰

Material Cost Calculation

Enter unit rates for each material. VittaLogic multiplies rate × quantity for every component, rolls up Sub BoM totals, and gives you the total cost of the Head BoM automatically. No spreadsheets needed.

Live Now
📐

Quantity-Based Costing — Scale Up or Down

Enter any production quantity and all component quantities and costs scale instantly. Want to know the cost of 5 units vs 10 units? Change the quantity — the entire BoM recalculates in seconds.

Live Now
🔗

Linked to Purchase & Sales

Explode any BoM into a Purchase Order to procure all raw materials, or into a Sales Order to sell finished products. All components, quantities, rates, and GST transfer automatically — zero re-entry.

Live Now
📊

Component-wise Cost Breakdown

See exactly how much each component contributes to the total product cost. Identify your most expensive materials, find cost-saving opportunities, and justify your pricing to customers with confidence.

Live Now
🏷️

HSN & GST on Every Component

Each material in the BoM carries its HSN code and GST rate from the item master. When the BoM is exploded to a purchase or sales order, GST is applied correctly on every line — automatically.

Live Now
🚀 On The Roadmap

More BoM features —
Coming Soon

These advanced manufacturing features are already planned — so VittaLogic grows with your business as operations get more complex.

🏭
High Priority

Production / Work Order from BoM

Create a Work Order directly from a BoM — assign workers, track production progress, record raw material consumption, and mark the finished goods as produced stock in your inventory.

  • Work Order raised from Head BoM
  • Raw material issued from stock automatically
  • Finished goods added to inventory on completion
  • Production cost tracked against BoM cost
In Development
📈
Coming Soon

Material Requirement Planning (MRP)

Based on sales orders or production targets, VittaLogic will calculate exactly how much of each raw material you need — and auto-generate purchase requests for whatever is short in stock.

  • Required qty calculated from open orders
  • Current stock checked automatically
  • Purchase request raised for shortage items
Planned
⚖️
Coming Soon

BoM Comparison Tool

Compare two versions of the same BoM side by side — see which components changed, which got cheaper, and how the total cost shifted. Essential for yearly cost reviews and vendor negotiations.

  • Version A vs Version B side by side
  • Cost difference highlighted per component
  • Total cost delta shown clearly
Planned
🗑️
Coming Soon

Scrap & Wastage Tracking

Account for material wastage in your BoM — define wastage % per component so your cost calculations reflect actual consumption, not just theoretical quantities. More accurate pricing, better margins.

  • Wastage % set per material in the BoM
  • Gross qty (with wastage) shown in purchase orders
  • Actual vs theoretical consumption report
Planned

Know your cost,
control your margins

Request a live demo and see how VittaLogic's BoM module helps you price right, procure fast, and build smarter.

Request a Free Demo → Next: Partner Management →